Rough Cut from Jake Clements on Vimeo.
Showing posts with label Video Construction. Show all posts
Showing posts with label Video Construction. Show all posts
Saturday, 27 March 2010
Tuesday, 16 March 2010
Editing 2
Today we are very close to finishing our music video. We have about 30 second's worth of space still to fill with footage and group member Jacob seems to be the one that is going to finish editing as it is fair to say he has done several extra hours worth of work on it. If we are able to finish today it would leave us in good stead for finishing our ancillary tasks and evaluating.
Tuesday, 9 March 2010
Editing
We have decided after watching the footage we got from our fifth day of filming that we enough enough to edit and have started to do so. We have edited in all of our lessons and in our free periods. During lessons we only leave two people in charge of editing with the rest of the group checking on their progress and offering their ideas. Working in a group of four allows us to do this with the main advantage being that we can work on our ancillary tasks at the same time. So far we have edited about half of our video without transitions and effects and i am confident if we continue with this work rate we can have a rough edit for this weekend. Currently group member Jacob has taken it upon himself to edit the most which is great as the video has consistency throughout. However i feel that some of the workload isn't being passed around evenly due to group member Alex being ill for a few days during editing although i feel he will make up for this in the final weeks of our coursework.
Wednesday, 3 March 2010
Fifth Day of Filming
Yesterday we undertook our fifth day of filming once again it was at the Red Lion Pub in Gravesend. I felt this time we were more prepared as we had the plan sheets to use so we could make sure we got the shots we wanted and i felt that we succeeded in this. With me, Tom and Jacob filming the same band as last time i felt we had got all the remaining shots we needed which only leaves the editing to do to complete our video. Although we completed filming later than i had hoped we have still got a few weeks before our deadline to get our editing and ancillary tasks complete. Here are some of the pictures Tom took during filming.
The picture above is a shot of me filming a side shot of the band playing.
This is a picture of the band performing and its the same angle where we had taken some shots on the video camera.
This is a picture of group member Jacob filming our drummer Matt for the opening sequence.
The is a picture of when we first arrived and i was telling our drummer what we wanted him to do.
This is an over shoulder shot of our drummer during filming.
Wednesday, 24 February 2010
Fourth Day of Filming
Yesterday we filmed for the fourth time in our third location. We used the red lion pub again which offered us good lighting last time we were on set. We knew that this time we were going to film more handheld shots which we immediately did. The first to film was group member Alex who was getting up close and personal with the band. At first this seemed like a good idea as we were able to direct around the group getting the shots we wanted. However upon looking at our footage on the computers we discovered that by filming as we went along we didn't film in order of the song. We instantly had the time consuming problem of having to pull clips of our video from all over the timeline on final cut. This wasn't our biggest problem however because we had lots of footage to edit for our final video but my main concern upon seeing the footage for the first time today is that we have missed out some parts of the song and there are times where there is some back room clutter ruining the shot. Although we have these problems i feel we have enough footage to start editing and building a base for further footage to come. With only three of us in the lesson to see the footage we have all agreed that we wold have to go back this weekend to get some more footage to improve on what we already have.
Tuesday, 23 February 2010
Fourth day of Filming
On Tuesday 23rd of February we have planned to go back to the red lion pub, where we were for our third day of filming, to film hopefully for the final time. We have booked the same room and have planned to improve where we went wrong last time by bringing extra lights and extension leads which would give us more freedom with our lights. We aim to get all our remaining filming done today and edit for the next few weeks to meet our final deadline on the 31st of March.
Friday, 12 February 2010
Photo's of Location 3
This pictures are the images taken on our third day of filming at our newest location. This is the basement stage of the red lion pub where several bands perform every week. The image below shows our band performing but it also shows the shadow's in the background which was our biggest problem while filming.
Wednesday, 10 February 2010
Practice Shots
The images below are some of the pictures we took at school to practice for filming on our third location. The image below is a close up on Jacob playing the guitar, this image was taken after we had filmed this shot. We of course all liked this shot so planned to use it in our actual video.
The shot below is Jacob singing into a pretend microphone from the side. Tom who took all these photo's has also got a picture of the camera filming.
Photo's of Location 2
These are some of the photo's of the scout hall that we used after we changed our song. The shot below is showing me and Alex setting up the set for the bands performance. As you can see on the back wall there are scout signs which can be clearly seen and this was part of the reason why we chose to change location.
The shot below is a picture of me setting up the filming area and as you can see on the floor i had to be very careful due to all the wires on the floor which i could have very easily have tripped over. We later tied these wires down to prevent an accident.
This is a picture of me filming the band as they perform out of shot. This also shows the problem of the side walls not being well covered and once again showing the faults of our location choice as notice boards where clearly seen on side shots.



This photo is a picture of Jacob setting up the drum set for our drummer Chris to play on. Once again he was making sure that the wires from the amps could be held down to prevent anyone tripping and to help keep as many loose wires out of shot.
This picture is just a blank picture of our set without any instruments. It once again shows what our major problem was which was the signs on the back and the typical scout hall floor.
Tuesday, 9 February 2010
Third Day of Filming
On our third day of filming we once again had moved to a new location. This was perhaps the best location overall but one we could have had prior to our first time filming. We had original thought of filming our music video at The Red Lion pub in Northfleet where many local bands first start out. This made the location a convenient choice for us as our band would feel more comfortable and it would also look more realistic as it is where bands play. At first the lighting was an issue as we couldn't light the whole band and when we did it didn't look to good. However after talking to the landlord we were able to get the stage lights to come on and this helped light the band better which meant we could continue filming. In total we got nearly an hour's worth of footage after being there for nearly 4 hours. In this day of filming we were able to get hold of another camera which should lead to better video quality. My main concern about this day of filming is if we got enough decent footage to use and edit in our final cut version. We may need to go back and get some more footage, and before i look at the footage on the computer i already feel that we didn't get as many handheld moving shots as i would have liked. The one remaining problem we have with our filming situation is that we are quickly running out of time and we are starting to feel the pressure.
Sunday, 31 January 2010
Second day of Filming
After filming for the first time to our new song i was optimistic that it would go better than previously. We arrived and we were instantly handed the task of getting the hall decorated to the way we wanted. This was far more time consuming than we had thought it would be and it took an hour and a half to fully set up, which was far to long. After setting up we then had a problem of what shot to do and how to do it. Once again we hadn't learnt from our previous mistake. However we had got some filming done which we will upload to final cut and edit it to see exactly what we can do with original filming. Once again we failed to use our planning to help us film and i will address the group about this along with our overall effort to get the job done as i feel this is holding us back from getting our music video done. Overall this filming session wasn't as productive as i hoped it would be but we got enough work done to help us build upon which should leave us in good stead for our next day of filming on Saturday.
Storyboard Images
Pre-filming blog
After a change of song we decided to re-think some of our original ideas and look at new angles and new shots that were now available to us through a change of idea. We had moved away from the concept of doing a story-based video to the idea of video a live band. We had immediately brainstormed some ideas that we thought were very promising and we were all eager to get filming. We started to talk about where we should film. Our initial idea was to film in a garage where our selected band normally practice. This would look authentic to a 'band practice' session which we could be representing. However group member Jacob said he could get hold of a scout hall and excellent lighting which was a great opportunity we couldn't turn down. So on Sunday 30th January we were going to film for the second time. We had an early problem when the bassist was miss-informed about the time of our filming which was down to our poor communication with him. The problem was resolved when already had someone else available to play the bass which was a nice piece of planning on our behalf. We estimate we will have around 3 hours in which to film so we should get enough done to start editing next week.
Wednesday, 27 January 2010
First Day of Filming
On Saturday we started to film our music video to Frank Turner's Photosynthesis. We all met at our actor Jon at his house where we planned to film in his basement. I had never been there before but was told it would be a good location. Upon arriving i saw that the room wasn't what i imagined and that there was only one corner of the room we could film. As the rest of the group started to arrive we placed our camera and tripod down and we were ready to start filming. Our only problem was that Jon, our actor, didn't know how to play or know the lyrics to our song. This meant a large delay on filming which then made us all lose attention and in the end we had no-where near enough footage to what had hoped to film. This is very disappointing as we had hoped to get a considerable amount done on our day of filming and to make matters worse, our actor was unavailable on the sunday which meant we had practically wasted a weekend of filming. We then discovered we may not be able to meet each others date of availability which put our while project into turmoil.
Subscribe to:
Posts (Atom)
















