Wednesday, 27 January 2010

First Day of Filming

On Saturday we started to film our music video to Frank Turner's Photosynthesis. We all met at our actor Jon at his house where we planned to film in his basement. I had never been there before but was told it would be a good location. Upon arriving i saw that the room wasn't what i imagined and that there was only one corner of the room we could film. As the rest of the group started to arrive we placed our camera and tripod down and we were ready to start filming. Our only problem was that Jon, our actor, didn't know how to play or know the lyrics to our song. This meant a large delay on filming which then made us all lose attention and in the end we had no-where near enough footage to what had hoped to film. This is very disappointing as we had hoped to get a considerable amount done on our day of filming and to make matters worse, our actor was unavailable on the sunday which meant we had practically wasted a weekend of filming. We then discovered we may not be able to meet each others date of availability which put our while project into turmoil.

No comments:

Post a Comment